Live Site Data

Every crack.
Every sign-off.
One screen.

Hard-hat walkthroughs become structured punch lists before the drywall dust settles. Built for contractors running twelve active sites — not one.

SITECHECK — RIVERFRONT TOWER · BLOCK C
LIVE
73%Done
Project Complete
Zone A87%
Zone B62%
Zone C94%
Zone D41%
Open Deficiencies
41
↑ 3 since last walk
Site Map — Floor 4Updated 06:31
ZONE A — 87%ZONE B — 62%ZONE C — 94%ZONE D — 41%
Live Survey Feed● streaming
Deficiency photo DEF-0041
DEF-0041·Crack
Zone AHIGH
06:12
Deficiency photo DEF-0042
DEF-0042·Water intrusion
Zone CCRIT
06:18
12,400+
Sites Inspected
340K+
Deficiencies Tagged
98%
Inspector Retention
< 4 min
Avg. Report Export
The Problem

Your current system is a disaster.

General contractors are running multi-million dollar projects on email threads, camera rolls, and clipboards held together with coffee stains.

RE: RE: RE: RE: FWD: Site walkthrough photos from Tuesday
47 attachments, no context
IMG_4821.jpg
No location. No tag. No follow-up.
Inspection Form v3_FINAL_use_this_one.xlsx
Last modified: 3 months ago
"check crack on north wall — follow up w/ Marcus"
Post-it note. Never followed up.
Text from Marcus: "sent you the photos"
Photos buried in iMessage
Paper punch list — 3 pages
Lost after site visit
CHAOS
73%
of punch list items get missed on first walkthrough
4.2 hrs
wasted per inspector per week on manual report compilation
$180K
average cost of rework caused by undocumented deficiencies
The Solution

One walkthrough.
Zero loose ends.

Sitecheck maps every pain point to a precision tool that works as fast as you do on-site.

Pain Point 01

Photos with no context → Geotagged deficiency cards

Tap, photograph, tag. Every issue gets a location, severity, and responsible trade — in under 8 seconds.

Crack deficiency at A-12
DEF-041
Crack · A-12
Water deficiency at C-08
DEF-042
Water · C-08
Anchor deficiency at B-03
DEF-043
Anchor · B-03
Rebar deficiency at D-17
DEF-044
Rebar · D-17
GPS accuracy:± 1.2m·Timestamp:Auto
Real-time

Project status at a glance

Every zone, every trade, every sign-off — one screen mounted to the trailer wall.

Riverfront Tower C73%
41 open
Harbor Lofts Phase 291%
8 open
Midtown Medical Ctr34%
127 open
Eastside Retail Strip58%
63 open
Pain Point 02

Email chains → Threaded comment streams

Every deficiency has its own thread. No more reply-all archaeology.

TK
T. KowalskiGC06:14
North wall crack flagged — needs structural review before pour.
DR
D. RamirezStructural07:02
Reviewed on-site. Hairline fracture, non-structural. Cleared for pour.
TK
T. KowalskiGC07:18
Sign-off timestamp logged. Moving to next zone.
Sign-off timestamped 07:18 — immutable record
Pain Point 03

Manual reports → One-tap PDF export

Professional inspection report with photos, GPS coordinates, timestamps, and sign-offs. Generated in under 4 minutes.

Riverfront Tower C — Inspection Report
41 deficiencies · 4 zones · 3 inspectors
Processing... 0%PDF · 2.4 MB
Cover page + site summary
Zone-by-zone deficiency list
Photo appendix (geotagged)
Sign-off audit trail
Trusted On-Site

Contractors who replaced
their clipboard.

Marcus Kowalczyk profile photo
I run 14 active sites. Before Sitecheck, my project managers were spending Friday afternoons compiling reports that were already outdated by Monday. Now I see everything live — deficiency counts, zone completion, who signed off what. It replaced my entire clipboard system in the first week.
Marcus Kowalczyk
General Contractor · Kowalczyk Construction Group
Chicago, IL
14 sites
managed simultaneously
Platform-wide stats
Sites inspected12,400+
Deficiencies resolved340K+
App Store rating4.8★
Trusted by field teams at
Turner ConstructionGilbane Building Co.McCarthy HoldingsDPR ConstructionSkanska USA
Ready to ship

Walk your first site.
Free. Today.

No setup fee. No training required. Download the app, open your camera, and walk your site. Your first structured punch list will be ready before you reach the truck.

✓ No credit card required✓ Works offline on-site✓ iOS & Android✓ First site free forever